IEC protocols for smart grid
All our implementations of IEC protocols share common basic library and API. Once your application is ready to use our IEC103 it is ready for our IEC61850 too.
IEC 61850
​
Our port of IEC61850 is based on our own, ground-up designed, ISO application protocol stack and MMS libraries. No dependence on 3rd party products. For easy applcation simple API is provided, that does not require application engineer to master IEC 61850. For POSIX compatible systems we have complete or near complete, off the shelf, solution. Inter opreability of our IEC 61850 server is field proven in substations across Europe with clients from several major RTU vendors.
IEC 60870-5-103 IEC 60870-5-104
For easy applcation, simple API is provided, that does not require application engineer to master IEC 103 or IEC 104. For POSIX compatible systems we have complete or near complete, of the shelf, solution. Inter opreability of our IEC 103 slave is field proven in substations across the world with masters from several major RTU vendors.